
Let the tracklaying begin
The handlaid turnouts in the WR&N II engine facility began with lots of double-stick foam tape.
Some of the long, high-speed turnouts for the mainline were already under way in the background.
Image specs: This is a scan of a 3x5 print taken with a 35mmcamera of unknown type. The
negative is long gone.
Continue to next image
Return to Clinic |