The White River and Northern Model Railroad

Let the tracklaying begin

Let the tracklaying begin

The handlaid turnouts in the WR&N II engine facility began with lots of double-stick foam tape. Some of the long, high-speed turnouts for the mainline were already under way in the background.

Image specs: This is a scan of a 3x5 print taken with a 35mmcamera of unknown type. The negative is long gone.

Continue to next image
Return to Clinic

Copyright © 2006-2012 by David K. Smith. All rights reserved.