
Roughing out the turnouts
After applying the styrene ties directly to the double-stick foam, sections of flex track
with ties removed were placed over top. The rails were shifted around until there were no
joints on the stock rails through the turnouts. In this image, the rails that meet at the
frogs were clipped to length, and all of the rails were heat-bonded to the styrene ties.
Image specs: This is a scan of a 3x5 print taken with a 35mm
camera of unknown type. The negative is long gone.
Continue to next image
Return to Clinic |