
Benchwork nearly completed
The benchwork has now reached the mountain pass area; all that is left to complete are the
hidden yard and the Bearcamp section. At the far right, the tape spool for the roadbed cuttercan be seen;
the March 1992 issue of Model Railroader has the details on how it was built.
Image specs: This is a scan of a 4x6 color print taken with a 35mm camera of unknown
type. The negative is long gone.
Continue to next image
Return to Chapter 4 |