The White River and Northern Model Railroad

Benchwork nearly completed

Benchwork nearly completed

The benchwork has now reached the mountain pass area; all that is left to complete are the hidden yard and the Bearcamp section. At the far right, the tape spool for the roadbed cuttercan be seen; the March 1992 issue of Model Railroader has the details on how it was built.

Image specs: This is a scan of a 4x6 color print taken with a 35mm camera of unknown type. The negative is long gone.

Continue to next image
Return to Chapter 4

Copyright © 2006-2012 by David K. Smith. All rights reserved.