The White River and Northern Model Railroad

Stacking the deck

Stacking the deck

While the Mattam yard was under construction, benchwork for the double-decked hidden staging yards at the opposite end of the layout was being completed. The plan was to have the staging yard tracks wrap around the perimeter of the deck, and a large hole in the middle would provide access to the stored trains.

Image specs: This is a scan of a 4x6 color print taken with a 35mm camera of unknown type. The negative is long gone.

Continue to next image
Return to Chapter 4

Copyright © 2006-2012 by David K. Smith. All rights reserved.